![]() |
|||
|
|
Phase Two of construction began by loading up moving trucks from the build site in Charlottesville to transport directly to the shipyard in Norfolk. The spring/summer team of 2009 is now staying in Norfolk to begin assembling components of the design directly onto the barge.
|
|
|