![]() | ...a project confronting issues of design and construction | |
| S P O N S O R S: | ||
![]() | Gus
Lorber, has spearheaded the financial support needed to bring this project to
life. Gus has physically worked with teams of students at Allied Concrete's site
and as a crtitic during the design and material slection phase of work. Allied
Concrete has donated all of the concrete used in this project. www.alliedconcrete.com | |
![]() |
Vlad
Wojcik of Advanced Concrete was sub-contracted
by Allied to provide a low retaining wall on the site. This boundary wall
was constructed with re-useable metal forms. Vlad Wojick also provided rough
site grading. Vlad Wojick, Operations Manager Advancec Concrete Foundations Inc. 197 Crossroads Center Troy Virginia 22974 804.589.1122 |
|
| Brian
Davis of Luckstone in Ruckersville, Virginia met with the students to discuss
aggregate types for the work terrace surface. Brian also discussed installation
methods and provided all of the necessary aggregate and bluestone pavers. Brian Davis, Sales, Blue Ridge Area PO Box Ruckersville, Virginia 22968 804.985.8830 |
||
| |
Carolina
Builders provided lumber and plywood for the concrete fomwork and the stair
platforms. Rick Thompson, Branch Manager Carolina Builders Corporation Charlottesville, Virginia 22902 804.293.3044 |
|
| |
Quality
Welding provided the steel base plates for the wood beams. thank you Donna
Drumheller! Quality Welding PO Box 6632 Charlottesville, VA 22906 804.295.3241 |
|
| school of architecture @ university of virginia | ||